Bassin Anticipation Timer
 

Bassin Anticipation Timer

Model 35575


  • Selectable speed from 1 - 255 MPH
  • Selectable Cue delay from 0.5 - 30.0 seconds Random Cue delay setting
  • Runway lights are twice the size and are five times brighter
  • Runway interconnection has been improved for increased life and reliability
  • Different start and ending speeds may be set for Acceleration or Deceleration
  • Storage of all test settings
  • Any light on the runway can be selected as a target light
  • Independent blanking of any light or section of lights along the runway
  • Stand-alone instrument with small portable control panel
  • Constructed for a wide range of user response methods - handheld push button, photocell, switch mat, or various custom applications

The modular runway sections can be configured for many lengths and a variety of applications. Curved runways are also available to assess peripheral target acquisition and anticipation. Three sections make a 90° arc on a 4.5 foot radius.

 

Details

Dr. Stanley Bassin originally developed the Bassin Anticipation Timer at California State Polytechnic University, Pomona. One of the applications of the unit is to test the area of human visual acuity related to eye-hand coordination and anticipation.

The subject is instructed to watch a light as it travels down the runway. They must anticipate the light reaching the target and press a pushbutton, or perform some other action, to coincide with the arrival of the light at the target. The new version of the Bassin Anticipation Timer incorporates many new features, as well as enhancements to existing features, adding new dimensions to your experiments. The additional features will allow researchers to explore new paradigms and new twists on old paradigms.



System Components

  • Start runway, Model 35571
  • Middle runway, Model 35573
  • End runway, Model 35572
  • Psychomotor control panel with LCD (PsymCon), Model 35500
  • 9V power supply
  • 10 foot DB-25 cable
  • Hand held response push button
  • Hand held remote initiate push button
  • Contrast adjust screwdriver
  • Target light marker
  • User's manual

Specifications

  • Number of lights per runway: 16
  • Distance between lights: 1.76" (center to center)
  • Number of lights per runway: 16
  • Distance between lights: 1.76" (center to center)
  • Light size: 10mm diameter
  • Light color: Yellow for cue, all others red
  • Maximum number of runways: 40
  • Power supply: 9V, wall mount transformer
  • Fuse: 1 Amp, auto-reset
  • Speed settings: 1 - 255 MPH
  • Speed resolution: 1 MPH
  • Clock range: 0 - 9.999 seconds
  • Clock resolution: 0.001 seconds
  • Cue delay range: 0.5 - 30.0 seconds
  • Cue delay resolution: 0.1 seconds
  • Runway length (start and end): 30.0"
  • Runway length (mid): 28.2"
  • Runway height (all): 3.63"
  • Runway width (all): 3.63"
  • Light size: 10mm diameter
  • Light color: Yellow for cue, all others red
  • Maximum number of runways: 40
  • Power supply: 9V, wall mount transformer
  • Fuse: 1 Amp, auto-reset
  • Speed settings: 1 - 255 MPH
  • Speed resolution: 1 MPH
  • Clock range: 0 - 9.999 seconds
  • Clock resolution: 0.001 seconds
  • Cue delay range: 0.5 - 30.0 seconds
  • Cue delay resolution: 0.1 seconds
  • Runway length (start and end): 30.0"
  • Runway length (mid): 28.2"
  • Runway height (all): 3.63"
  • Runway width (all): 3.63"

Science

Recent 2019 Publications

Boat, R., Morris, M., & Duncan, M. J. (2019). Effects of exercise intensity on anticipation timing performance during a cycling task at moderate and vigorous intensities in children aged 7-11 years. European journal of sport science, 1-9.

Gunay, A. R., Ceylan, H. I., Colakogolu, F. F., & Saygin, Ö. Comparison of Coinciding Anticipation Timing and Reaction Time Performances of Adolescent Female Volleyball Players in Different Playing Positions.

Select 2018 Publications

Kuan, Y. M., Zuhairi, N. A., Manan, F. A., Knight, V. F., & Omar, R. (2018). Visual reaction time and visual anticipation time between athletes and non-athletes. Malaysian J. Public Health Med, 1, 135-141.

Crocetta, T. B., Guarnieri, R., Antunes, T. P. C., Massetti, T., Abreu, L. C. D., Fabian, P., & Monteiro, C. B. D. M. (2018). Instruments for studying coincidence-anticipation timing - An updated systematic review. Journal of Physical Education and Sports Management, 5(1), 37-52.

Ceylan, H. I., & Saygin, O. (2018). Acute effect of various exercise intensities on cognitive performance. European Journal of Physical Education and Sport Science.

Select 2017 Publications

Bozkurt, S. (2017). Perceptual and Motor Components at Young Football Players. Journal of Education and Training Studies, 5(13), 59-63.

Omar, R. H., Meng, K. Y., Knight, V. F., Manan, F. A., & Padri, M. N. A. (2017). Visual anticipation time differences between athletes in open and closed skills sports. Malaysian Journal of Movement, Health & Exercise, 6(1).

Accessories

Optional Accessories

PsymLab Psychomotor Control Software
PsymLab Psychomotor Control Software
Model 35800A

PsymLab provides researchers with a powerful tool for organizing subject information, designing/building customized experiments, and generating unique data reports.

PsymCon Control for Psychomotor Devices
PsymCon Control for Psychomotor Devices
Model 35500

This key panel has a digital display and is used with our various Psychomotor devices such as the Model 35600 MOART Reaction Time / Movement Time Panel, Models 35575 and Model 35580 Bassin Anticipation Timers and Model 16030 Stability Platform. This panel includes a 10 foot 25-pin connecting cable.

Start Runway for Bassin Anticipation System
Start Runway for Bassin Anticipation System
Model 35571

This is a replacement Start Runway for the Bassin Anticipation Timers.

End Runway for Bassin Anticipation System
End Runway for Bassin Anticipation System
Model 35572

This is a replacement End Runway for the Bassin Anticipation Timers.

Intermediate Runway for Bassin Anticipation Systems
Intermediate Runway for Bassin Anticipation Systems
Model 35573

This is an Intermediate Runway for the Bassin Anticipation Timers.

Push Button Remote
Push Button Remote
Model 54350

A normally-open remote Push Button for use with our Bassin Anticipation Timer, Model 35575 as the response button and/or initiate button.

Copyright © 2024 Campden Instruments. All Rights Reserved.

Product Search

Use the provided form to search for products on this website.